The Project
The new Wembley Stadium was the first for a new generation of sports stadiums, with services unmatched around the world. The 90,000 capacity bowl stadium, with state-of-the art facilities, is the ultimate and most versatile stage for major sporting and musical events.
The Wembley construction design required a complete waterproofing system, which would provide high-grade waterproofing for the basement area and retaining walls, due to the presence of high voltage electrical transformers and heating needed to power the stadium.
Waterproofing continuity was essential for the basement and exposed deck areas, to achieve a complete solution. The stadium construction design also required numerous movement joints in the basement structure, which are always the highest risk of any waterproofing system.
We offered a comprehensive waterproofing system, which comprised technical design service, on-site technical support, as well as a waterproofing membrane and waterstop combination.
A complex network of waterstops with movement joints was detailed for the Wembley construction project.
The waterstops provided the security required to deal with water pressure due to the systems’ continuously active sealing element. The hydrophilic elements swell when in contact with water, which then actively seal plug voids created by concrete shrinkage.
Blue360sm Design Advantage: Your design needs in a single source.
GCP Products Used
BITUTHENE® 4000 & 8000, a self-adhesive water and vapour membrane, for the protection of the basements was used along with, PREPRUFE® 300R, a pre-applied bonded waterproofing membrane. The stadium construction project required a waterproofing system with a quick application process and the ability to support variable temperatures. BITUTHENE® and PREPRUFE® were selected for their ability to withstand different seasonal temperatures and conditions over the course of a lengthy timeline.
PROCOR® Deck System 2 and 4R, and PROCOR® 75 were quickly spray-applied to the elevated deck areas, resulting in a reduction of the overall project time.
SERVIDEK® /SERVIPAK® cold-applied waterproofing system, appropriate for heavily trafficked decks, suited the ramp areas leading to the decks. This system allowed the surface to be trafficked immediately after the SERVIPAK® protection boards were laid, permitting work to begin without delay.
gcpat.my | For technical information: asia.enq@gcpat.com
GCP Applied Technologies Inc., 2325 Lakeview Parkway, Alpharetta, GA 30009, USA
GCP Applied Technologies (Malaysia) Sdn. Bhd, 7 Lorong CJ 1/1A, Off Jalan Balakong, 43200 Cheras Jaya, Kuala Lumpur, Malaysia
This document is only current as of the last updated date stated below and is valid only for use in Malaysia. It is important that you always refer to the currently available information at the URL below to provide the most current product information at the time of use. Additional literature such as Contractor Manuals, Technical Bulletins, Detail Drawings and detailing recommendations and other relevant documents are also available on www.gcpat.my. Information found on other websites must not be relied upon, as they may not be up-to-date or applicable to the conditions in your location and we do not accept any responsibility for their content. If there are any conflicts or if you need more information, please contact GCP Customer Service.
Last Updated: 2023-08-31
https://gcpat.my/en-gb/about/project-profiles/wembley-national-stadium-gets-waterproofing-protection-foundation-roof-and