The Project
Ireland’s new international stadium for rugby and football, the Aviva Stadium, is located in Dublin, and officially opened in May 2010.
Conceived by the Irish Rugby Football Union, the Football Association of Ireland and Irish Government, stadium construction began on the site of the old Lansdowne Road venue, which was demolished in 2007.
It has four tiers and a capacity for 51,700 seated spectators.
The stadium’s distinctive roof design, shaped in a wave-like manner, integrates well with the residential area of Dublin—rising in the east and west, and falling in the north to minimise the impact to adjoining neighborhoods. Making it one of the most unique sports stadiums in Ireland.
During stadium construction, a black concrete with an exposed aggregate finish was required for an external podium deck at the corporate entrance to the ground.
The original specification was designed with the podium deck to be covered with black tarmacadam. However, as HYDRODUCT® Drainage System was also being employed to remove water from the deck, there was a fear that the hot tarmac would melt the plastic pipes of the HYDRODUCT® drainages when it was laid on top of them and greatly reduce their effectiveness.
The architects wanted to cover the deck with a material that would have the same aesthetic appearance as tarmacadam but would not have an adverse effect on the performance of the HYDRODUCT®, Drainage System.
The solution was TC3 Exposed Aggregate System during stadium construction. It allowed the production of a black concrete with an exposed aggregate finish, which gave a similar appearance and texture to tarmacadam, without posing a threat to the integrity of the drainage system.
TC3 System is an exposed aggregate concrete finishing solution that provides functional and aesthetically pleasing surfaces for both grey and integrally coloured concrete applications.
Several laboratory and full-scale trials were carried out until the top surface of the concrete revealed exposed coarse aggregate, suitable for sports stadiums in Ireland. It was all made possible thanks to GCP’s Blue360sm Total Business Advantage, which provided the products and services needed to optimise the project.
gcpat.my | For technical information: asia.enq@gcpat.com
GCP Applied Technologies Inc., 2325 Lakeview Parkway, Alpharetta, GA 30009, USA
GCP Applied Technologies (Malaysia) Sdn. Bhd, 7 Lorong CJ 1/1A, Off Jalan Balakong, 43200 Cheras Jaya, Kuala Lumpur, Malaysia
This document is only current as of the last updated date stated below and is valid only for use in Malaysia. It is important that you always refer to the currently available information at the URL below to provide the most current product information at the time of use. Additional literature such as Contractor Manuals, Technical Bulletins, Detail Drawings and detailing recommendations and other relevant documents are also available on www.gcpat.my. Information found on other websites must not be relied upon, as they may not be up-to-date or applicable to the conditions in your location and we do not accept any responsibility for their content. If there are any conflicts or if you need more information, please contact GCP Customer Service.
Last Updated: 2023-09-01
https://gcpat.my/en-gb/about/project-profiles/aviva-stadium-construction-reaches-new-levels-gcp-s-tc3-system